TxDOT Static Travel Time Displays Project
Description
This project will install static signs with small DMS panels to display estimated travel times to destinations or comparable travel times via different routes. Those signs will be installed at locations approaching major interchanges. In addition, confirmation signs will be installed throughout the corridors. The ITS Master Implementation Plan identifies eight project segments totaling 28 travel time displays along IH–10, SL 375, Spur 601, and US 54.
Status
Future
Timeframe
Short Term
Stakeholders
Inventory
Driver |
TransVista |
TxDOT El Paso District Static Travel Time Displays |
TxDOT El Paso District Traffic Operations Personnel |
Services
TM06–Traffic Information Dissemination |
TM06–Traffic Information Dissemination (TxDOT Static Travel Time Displays) |
Interfaces
Source |
Flow |
Destination |
Status |
TransVista |
roadway dynamic signage data |
TxDOT El Paso District Static Travel Time Displays |
Future |
TransVista |
traffic operator data |
TxDOT El Paso District Traffic Operations Personnel |
Future |
TxDOT El Paso District Static Travel Time Displays |
driver information |
Driver |
Future |
TxDOT El Paso District Static Travel Time Displays |
roadway dynamic signage status |
TransVista |
Future |
TxDOT El Paso District Traffic Operations Personnel |
traffic operator input |
TransVista |
Future |